Master Tibot
Location : Baku, Azerbaijan

Client : ISR Holding Ltd, Azerbaijan

Project Description : The project consisted of a turn-key basis of a 4,000 sqm market building. Infrastructure works covered electric power supply, a generator, cold water, natural gas supply and waste and rain water drainage system.

Completion Date : August, 1996




Copyright @ 2013 Yeşil Yapı Endüstrisi A.Ş.